Practical guide

Goal-based base operations

Goal

Start from the work your base must perform, then connect Pal roles, crafting demand, and structures.

Current verified coverage

These counts are generated from the same data used by the linked tools and update with them.

Base team planner
12work roles
Structures
472catalog entries
Item database
1,892catalog entries

Before you start

Keep these verified tools open so each decision uses the current catalog.

Step-by-step procedure

Open each linked tool in order, confirm the current data, and keep the result beside your game.

  1. 1Base team plannerChoose the base goal, required work roles, minimum levels, and team limit before selecting Pals.
  2. 2Pal databaseCompare Pals by the required work suitability and keep only candidates that cover the planned roles.
  3. 3StructuresReview the structures that support each job and confirm their progression requirements before committing the layout.
  4. 4Crafting calculatorCalculate direct and expanded material demand, and stop at any recipe choice that still needs your decision.
  5. 5Item databaseUse the item catalog to confirm remaining inputs, categories, and recipe links before spending resources.

Check the result

Before you spend resources or apply changes, confirm each checkpoint.

  • Base team plannerRequirements and the next action are clear before resources are spent.
  • Pal databaseThe selected option and its reason are recorded.
  • StructuresConstraints, warnings, and unavailable values have been checked.
  • Crafting calculatorRequirements and the next action are clear before resources are spent.
  • Item databaseConstraints, warnings, and unavailable values have been checked.